menu
Change Location Change Location

You appear to be near: Central/Midwest

Please confirm or change to view projects in your region.

YOUR REGION

Central/Midwest
Confirm
  • Central/Midwest
  • Northeast
  • South
  • West
  • Canada
  • International

June 2025

Companion Bridge Design Unveiled for Brent Spence Bridge Corridor Project

CINCINNAT - Ohio Governor Mike DeWine and Kentucky Governor Andy Beshear unveiled the design of the state-of-the-art companion bridge to be built as part of the 8-mile Brent Spence Bridge Corridor Project in Cincinnati and Northern Kentucky.

The announcement marks a major milestone in one of the nation's most significant transportation investments that will improve safety and strengthen economic development opportunities.

"As we went through the designs, we wanted this bridge to be cost effective, functional, and safe, but we also wanted it to look good," said Governor DeWine. "This bridge will become an iconic part of the Cincinnati skyline and a landmark gateway that honors our states' excellence in engineering, transforms the daily commute, and keeps commerce moving."



The selected design is a cable-stayed independent deck bridge. Instead of using a traditional steel truss to support the bi-level bridge’s lower deck, both decks will be supported by a cabling system similar to those used in other modern bridges, such as the Abraham Lincoln Bridge in Louisville and Veterans Glass City Skyway in Toledo. Unlike other double-deck bridges, no steel work will connect the two decks.

“The new companion bridge will be a game-changer for commuting families and it’ll revolutionize a crucial economic corridor,” said Governor Beshear. “This is a project that has been dreamed of for years and that many said would never happen. But we are getting it done by working together -- and we’re doing it without tolls.”

Northbound drivers crossing the Ohio River from Kentucky into Ohio will use the top level of the new bi-level companion bridge, which showcases an unobstructed view of the Cincinnati skyline and the bridge's unique design.

The design team, managed by the Ohio Department of Transportation (ODOT) and Kentucky Transportation Cabinet (KYTC), evaluated multiple concepts against key visual and aesthetic criteria, including how well they fit the surroundings, their visual connection to the existing bridge and their potential to become a recognizable regional landmark. The design also underwent extensive technical review and wind testing. Ultimately, cost, constructability, and schedule were the deciding factors in the selection of the bridge type. Compared to the other options considered, this design is lower in cost and easier to build.

“This is more than just a bridge — it’s a long-overdue investment in the future of our region,” said ODOT Director Pamela Boratyn. “For decades, communities have waited for a safer, more efficient crossing that not only eases traffic and improves safety but also strengthens one of our most critical freight corridors. This new bridge will unlock economic opportunities, support regional growth, and better connect people and commerce for generations to come.”

“This companion bridge reflects the values of the communities it connects — practical, forward-looking, and built to last,” said KYTC Secretary Jim Gray. “With the bridge design selected, our expert teams continue to work hard behind the scenes on activities to help us march toward construction."

The Brent Spence Bridge Corridor Project is among the nation's most significant transportation transformations, spanning eight miles of I-71/I-75 in Kentucky and I-75 in Ohio. Beyond the new companion bridge, the project includes improvements to the existing Brent Spence Bridge to carry local traffic, redesigned ramp configurations throughout the corridor, new pedestrian and bike paths connecting communities to transit and employment centers, and aesthetic improvements designed to create walkable, urban environments.

With the design selection complete and acknowledgment from the Federal Highway Administration concurring with the bridge type, the Walsh-Kokosing Design-Build Team (Walsh Construction and Kokosing Construction, with AECOM and Jacobs for design) will continue to advance the project toward final engineering and construction phases. The companion bridge, along with comprehensive corridor improvements, will address one of the country's most severe traffic bottlenecks while creating new opportunities for regional economic growth and community connectivity.

The existing Brent Spence Bridge, which has served the region since 1963, currently carries traffic volumes far exceeding its original design capacity. It will be reconfigured to three lanes on each deck with emergency shoulders on each side to improve safety and carry local traffic between Covington and Cincinnati. The new companion bridge will carry traffic on I-71 and I-75. Learn more at www.BrentSpenceBridgeCorridor.com.

Walsh

WALSH CONSTRUCTION

929 West Adams Street
Chicago, Illinois 60607
T: 312.563.5400
F: 312.563.5466

Walsh

ARCHER WESTERN

2839 Paces Ferry Road SE
Suite 1200
Atlanta, Georgia 30339
T: 404.495.8700
F: 404.495.8701

Walsh

WALSH CANADA

36 York Mills Road
Suite 302
Toronto, Ontario M2P 2E9
T: 416.849.9000
F: 416.849.9100

©2024 The Walsh Group. Equal Opportunity Employer (EEO) including Disability/Protected Veterans (link). All Rights Reserved. View our EEO Policy here: (link). View a digital copy of the Federal, State, and Federal Contractor Posters: (link)

The Walsh Group, Ltd. is committed to providing equal opportunity to qualified applicants with disabilities to compete for jobs. To request a reasonable accommodation in completing this application, please contact the Human Resources Department via phone at 312-563-5905 or via email at HR@walshgroup.com. The Walsh Group does not screen applicants based on their wage or salary history or seek this information from applicants’ current or former employers.   Walsh Canada Accessibility