Dover Air Freight Terminal
        Location
        Dover Air Force Base, Delaware
        Owner
        US Army – Philadelphia District
        Architect
        DMJM
        Contract Value
        $73,000,000
    
   The design-build project entails the construction of a 900-foot by 250-foot cargo processing and handling facility with associated office, administration and SCIF spaces. The structure reaches a height of 64 feet where it houses an elevated transfer vehicle (ETV) for movement and storage of cargo. Specific facilities included in this project are enclosed cargo processing space, a security cage, an MMHS maintenance shop, a recouperage/carpenter shop, a mail room, covered storage space, enclosed hazardous materials storage space and administrative space. The Dover Air Freight Terminal at Dover Air Force Base was designed and constructed to SPIRIT Gold standards.