menu
Change Location Change Location

You appear to be near: Central/Midwest

Please confirm or change to view projects in your region.

YOUR REGION

Central/Midwest
Confirm
  • Central/Midwest
  • Northeast
  • South
  • West
  • Canada
  • International

Transit

Valley Metro Rail – Light Rail Station Finishes

Location
Phoenix, Arizona
Owner
Valley Metro Rail (VMR)
Architect
Valley Metro Rail
Contract Value
$68,000,000

The Valley Metro Station Finishes project included delivery of 33 stations along 21 miles of light rail track. The line begins in north Phoenix and travels through downtown Phoenix and Tempe terminating in east Mesa. As the line passes through downtown Phoenix, it stops at the Convention Center, US Airways Center and Chase Field ballpark.

33
The project included the delivery of 33 stations along 21 miles of light rail track.

Additional Experience

Bridges

Bridges

Highways

Highways

Aviation

Aviation

Walsh

WALSH CONSTRUCTION

929 West Adams Street
Chicago, Illinois 60607
T: 312.563.5400
F: 312.563.5466

Walsh

ARCHER WESTERN

2839 Paces Ferry Road SE
Suite 1200
Atlanta, Georgia 30339
T: 404.495.8700
F: 404.495.8701

Walsh

WALSH CANADA

36 York Mills Road
Suite 302
Toronto, Ontario M2P 2E9
T: 416.849.9000
F: 416.849.9100

©2021 The Walsh Group. An Equal Opportunity Employer, Disability/Veteran. All Rights Reserved.   Walsh Canada Accessibility