Conveyance Pump Station

Owner:
North Texas Municipal Water District
Location:
Combine, Texas
Architect:
Alan Plummer & Associates
Contract Value:
$15,000,000
Completion Date:
April 2008
This project consisted of the construction of the East Fork Raw Water Supply Project, Conveyance Pump Station. This Pump Station was originally designed for three pumps with the ability to ultimately have five pumps - three vertical turbine pumps, one constant speed pump and two variable speed pumps. The Pump Station includes all five pump cans or barrels and anchor bolts, all sized for future pumping conditions. The operating level is at a grade for the pumps, motors, valves, discharge piping and electrical gear.