Design/Build Dover Air Freight Terminal

Owner:
US Army – Philadelphia District
Location:
Dover Air Force Base, Delaware
Architect:
DMJM
Contract Value:
$73,000,000
Completion Date:
May 2007
The Air Freight Terminal at Dover Air Force Base is a design-build project performed for the Air Mobility Command, under contract to the U.S. Army Corps of Engineers, Philadelphia District. The project entails the construction of a 900 foot long by 250 feet wide cargo processing and handling facility, with associated office, administration and SCIF spaces. The structure reaches a height of 64 feet where it houses an elevated transfer vehicle (ETV) for movement and storage of cargo. The Dover Air Freight Terminal was designed and constructed to meet SPIRIT Gold standards.